August 28, 2010
August 23, 2010
August 22, 2010
And off they go!!!

Well, after a grueling couple of weeks of testing, trouble shooting, some failure, re-testing, more fabrication, more safety precautions, we are finally done. As done as it will be for Burning Man! Like most projects, "done" is a misnomer, as I could spend another year perfecting this sculpture... but for now- it works, and it works well! A few things we learned during the first test- we needed to truss the arms that hold the jets to stabilize the cage, and the jets after they really start spinning(so fast!!) I called on an old friend who brought his portable welding rig out to the site and helped truss the arms in question over some beers and a sweet afternoon.
The consequent test was successful except for the hose clamps failing on the big jet, propelling it into the cage. This seeming disaster had an unexpected upside though, as I replaced every hose clamp with the heaviest duty aero/space clamp money can buy and welding on a safety bracket to hold every jet to it's respective arm securely. It happened to the largest jet, and it flew into the cage, which held up minus a dimple. The jet was repairable and will still work fine. Glad it happened during testing!
The console interface is still finicky, but works great if you have the touch. There is a delay in response of the jets, which will require some concentration on the players part. It truly is a very interactive sound sculpture- not for the weak at heart!!
So tomorrow it gets loaded, hopefully without too many hitches. It's a bit bulky for a trailer load, but, hey, what weird sculptures are not? Tuesday early it's due to depart for its long journey to the Playa. I have been excited for this day for a while, though I will admit I wish I could now go, even if it was just for a little bit- to see it up and running, on the beautiful Black Rock Desert.
Then again, I get a firm kick from the little one inside, reminding me I have other things to tend to...like giving birth in a few weeks. oh yeah.
The project will be well documented, by my good friend Wendy Shuey, and I am excited to see pictures & video and will post them post event!
To all of you who helped make it happen- Thank you!!! I am so grateful for having this opportunity especially pre baby. May the project fair well, may the team be safe, and wishing you all the best Burn ever!



August 12, 2010
First Test!
Well, we busted a move and finally got all the components together to have our first test of the jets inside the cage.
Four out of five worked well- the smallest one is a bit cranky but we will get it going for the second test tomorrow. Thank you to all volunteers that came out and helped last night!
The jet in the movie started vibrating too much and slammed into the supports holding it to the cage- luckily it did little damage to the jet. We will be cutting the jet arms a bit shorter and fine tuning the counterweights tomorrow to help with this problem. They sure spin fast, and together it's going to be a crazy ruckus in there.
enjoy the movie- more after test #2...
Four out of five worked well- the smallest one is a bit cranky but we will get it going for the second test tomorrow. Thank you to all volunteers that came out and helped last night!
The jet in the movie started vibrating too much and slammed into the supports holding it to the cage- luckily it did little damage to the jet. We will be cutting the jet arms a bit shorter and fine tuning the counterweights tomorrow to help with this problem. They sure spin fast, and together it's going to be a crazy ruckus in there.
enjoy the movie- more after test #2...
July 29, 2010
Commutators & Wiring & Forging!



!
July 23, 2010
Working Days, Working Nights

Time does fly! I had some crazy ambition that the project would be DONE by now, but hey, we are close, but not quite there yet. We have had a good turnout of help and we are in the last stretch to get the cage done and the jets mounted. Most of the components had to be ordered so there has been plenty of time spent tracking missing or late packages. We have set a deadline to test the sculpture, and everyone on the crew is working hard to meet that. The fabulously made commutators are done, thanks to Christian, and are ready to get mounted on the jet arms. Steve is working hard to get the console wired for interfacing with the jets and the public- not an easy task! I finally found 300' of affordable propane hose with appropriate JIC fittings, which should arrive next week, and then we are ready to test!
Personally I am falling in and out of good use as my 30 LBS front pack is wearing me down in the shop- baby is heavy!
And on another note, there is now a kickstarter support page for the project to help us get over the budget crunch- Hopefully our goal of $1000 will get us there! Any donation is very appreciated, small as well as big!







June 27, 2010
AWESOME Work Day

Suddenly there are five volunteers in the shop on a Saturday busting ass on the cage! The cage is almost done, the pulse jets have arrived (thank you Eric!) and we are about to put everything together. The control station is mostly built, and now needs the plumbing and the various cool switches and dials, to be doctored by Steve Storz- our team electric artist. Once the skeleton of the cage is finished, all the plumbing goes in, as the propane will feed through the middle rib of each quadrant for four of the jets and the fifth will lay on the floor. Christian is machining the commutators, which will enable the jets to spin freely. The cage is big, but light, and the only hic-up so far is how to fit it on a trailer... Hopefully a 22 ft. trailer will do the job- but first I have to find one...




May 28, 2010
It's Up for the first time!
Scraping together a crew is not always the easiest thing out here in Taos, but I have to say today's crew was awesome and we got plenty done! After gusseting some of the angled corners we schlepped the four pieces outside and bolted them together. Now normally at the bolting stage there should be some tweaking, but, for some stroke of great luck (or just decent measuring) it came together perfectly. We bolted the top ring together, then made angle brackets for the bottom to hold the structure together. All this before the weather decided to go to hell and we called it a day. It's a great looking cage! Next up we will be welding bracing on to the ribs and infilling with rod to add structure and strength.

May 18, 2010
May 07, 2010
The Build Commences...




Finally! I always pay attention to the very first cut in the shop that signifies the actual fabrication starting point of a project, and this cut happened on April 29th 2010. Living out in beautiful Taos New Mexico has a variety of challenges, including the extreme difficulty of getting specific materials delivered here. Steel comes once a week from Albuquerque, if you forgot or missed something, or worse they forgot or missed something, you are running at idle for another week. The round trip drive to Albuquerque is six hours, making the idea of running down there and getting it yourself a small road trip(without the perks) and with gas prices as high they are and a large truck to haul the stuff back on to boot, a non option.
So after weeks of waiting for checks to clear, for materials to be delivered, for a few volunteers, the project is slowly creeping along. This would not be such a big deal if the reality of my situation was not as it is- which is that I am also currently fabricating a baby(!) which takes a bit of energy and ultimately is much more exciting than any steel sculpture I am building in the shop! Due to that, I am currently in the so called honeymoon phase of pregnancy, the middle phase, aka the second trimester. Energy is good, health is great, mobility is compromised but OK. Looking for a pair of shop pants that actually fit is not easy- welding maternity, anyone? Come July I will be in my third trimester, and I am guessing based on how much room this new addition is taking in my body all ready, that I will not be too excited to be working in the shop at that point.
So, now that I have set the scene- I will start the documentation of the build, epic on some levels, straight forward on others. First- building the Cage. It's a fairly large structure- a 16 sided 17 FT tall and 18FT across elliptical Cage. I guess the angles from the Heron Project did not satisfy my masochistic desire to build something so geometrically elaborate, so I am now working with ROUND stock and complex angles! It will break down into quadrants, and hopefully squeeze onto trailer for transport. My dedicated shop hand and 2nd Project Lead, Gregory, is in full swing helping me roll the ellipses out to form the main structure. And Yes, the roller we are using is from the 1940's. Johnny helped out with rolling and drilling the collars that are going to hold the cage together. Then there is the infill, between each rib with forged filigree and expanded metal. Some ribs will contain propane fittings, as the gas will run within the rib. The five arms that hold the jets will be rolled and built, with two-port commutators, and bolted on.
In the meantime, Eric Beck, pulse Jet maestro is fabricating five pulse jets of varying sizes, and will be coming out here in June for the mounting and final acoustic testing of the jets inside the cage. After the cage is done there is the interfacing station- the control station that has to be built and wired to work with the jets. Not a piece of cake.
But, let's take one thing at a time... so first shots of cage fabrication! Note that that is not a beer belly but a baby belly I am sporting, in case you skimmed over the first part!
Subscribe to:
Posts (Atom)